Baseline

by Chris (noreply@blogger.com) from A PreFab Project  (prefab blog) last modified 05-14-2008 08:13

Editorial Rating: 1 2 3 4 5 Reader Rating: 1 2 3 4 5 ( 0 votes)
Click to change your reader rating: (not rated)   worthless bad average good great

Here's where we stand right now, in all its messy detail, and as if we're walking from the upstairs bedroom to the downstairs bedroom (one below the other):


Through the kitchen, dining room, living room:


Down the stairs:


To the tv room (and there's the tv!):


Past the boys' bedroom:


Past the bathroom:


And finally the big bedroom downstairs (the most finished of all the rooms, so naturally serving as a closet of sorts at the moment):


So that's what we're working with. Actually not too much left to do: finish mudding and taping the boys' room and the bathroom, finish coat of paint, toilet/cabinet/sink in bath, treads/risers/landing on stairs. Let's hope the "after" pics show some progress.