Today was without a doubt the foggiest I've seen on Talbot Avenue, but regardless of the weather it's still lovely up on the hill. And it will be lovelier when I can walk out in this five foot wide deck, which cantilevers out from the back of the first floor.

The framing began this morning, with pressure treated lumber nailed onto the TJIs and LVLs. The actual finished material will be LockDry Watertight Aluminum Decking in a white powder coated finish. The blocking was also being installed this afternoon, and assuming we passed this afternoon's inspection the plywood sheathing will be down by the end of the week.