Personal tools
log in | join | help
Sections

CLEANING UP

by LiveModern Webmaster last modified Jan 04, 2012 02:38 AM
Editorial Rating: 1 2 3 4 5
Average Rating: 1 2 3 4 5 ( 0 votes)
by TaC studios, architects last modified May 30, 2011



 

 



So much of building is moving one pile of stuff to another pile of stuff, and LEED pushes the team to thoughtfully think about that move.We are at the point that everything has been decided,orders are in place, and everything has been scheduled. Much is out of our hands-i.e. inspections. So far. all has gone well. The rough-in of electrical, plumbing,and mechanical has moved nicely. Great details like closing of the duct register location (to prevent dirt from filling the line),insulating supply plumbing line (efficiency of hot water & reduce condensation inside the floor system). On the outside on the site we have moved 1 pile of dirt to fill in the front courtyard, and took delivery of some great top soil for the garden. Next week we will host an event(June 8th, 6-8pm) so everyone can check-out the house prior to insulation. I just hope the steel stairs arrive in time from the custom fabricators!


 

 

 
 
 

Website migration, maintenance and customization provided by Grafware.