by LiveModern Webmaster last modified Jan 04, 2012 02:33 AM
Editorial Rating: 1 2 3 4 5
Average Rating: 1 2 3 4 5 ( 0 votes)
by Lampton House Development (noreply@blogger.com) last modified Mar 21, 2010



 

 

CLICK ON ABOVE PHOTOS FOR GALLERY
additional progress has been made over the past two weeks. the exterior has been caulked, primed and painted. exterior has been painted a soft white, while the beams are painted a light gray. the galvanized flashing around the brick and main beams are left exposed, while the flashing near the panels have been painted the same color. inside, speaker wiring and conduits have been run, and insulation installed. hopefully all has been put in order now, since the drywall will go up this week. this will make a very large difference when on the inside.





 

 

 
 
 