Personal tools
log in | join | help
Sections

heavy equipment

by Mark Meyer last modified Jan 04, 2012 04:12 AM
Editorial Rating: 1 2 3 4 5
Average Rating: 1 2 3 4 5 ( 0 votes)
by Mark Meyer last modified Oct 28, 2010

Tuesday was a big day at the shop. A 18ton crane showed up at the shop to help load two of the boxes to be shipped over to the trailer place for attachment of running gear and tongue for towing....




 

 

Tuesday was a big day at the shop. A 18ton crane showed up at the shop to help load two of the boxes to be shipped over to the trailer place for attachment of running gear and tongue for towing. They'll come back to the shop for final fit-out as actual trailers.

 

Crane

 

Crocker Crane Rental showed up early and prepped to pick the two boxes while we waited a bit for the lowboy tilt-bed towing service truck to show. Once they got here it was a quick and painless lift and set, and the tow truck shuttled the boxes down the street to the trailer shop. All in all it was an exciting yet straight forward day.

 

Flyingbox

 

In prep for shipping the boxes off to the trailer shop we finalized all the welding on sushiBOX, sheathed-out the interior walls and floor in prep to accept the cleanable interior finish-out, and got the three overhead flaps operable, and prepped and primed the interior exposed steel. We also have pre-fabricated the swing doors, and are currently building out the cabinets in preperation for the return of the box as an actual trailer.

 

Flaps-up


 

 

 
 
 

Website migration, maintenance and customization provided by Grafware.