more casita progress

by LiveModern Webmaster last modified Nov 10, 2012 01:06 AM
Editorial Rating: 1 2 3 4 5
Average Rating: 1 2 3 4 5 ( 0 votes)
by Mark Meyer last modified Nov 09, 2012

In fits and starts the casita project is moving forward. Framing is 99% complete, windows are going in, roof is going on, siding is going up. It's not all exactly like originally designed, as various hurdles have sprung up in...




 

 

In fits and starts the casita project is moving forward. Framing is 99% complete, windows are going in, roof is going on, siding is going up. It's not all exactly like originally designed, as various hurdles have sprung up in the scheduling and ordering of materials that have caused some quick compromises, but it's still shaping up nicely.

IMG_1429

The Zip-System sheathing is helping better define the overall massing and window composition.

 

IMG_1430

The master bedroom deck structural steel is up to support the exposed rafter tails of the roof trusses. The "eyebrow" framing over the downstairs sliding glass doors is also in place and helps define the gound floor connection to the backyard.

 

IMG_1448

Exposed v-groove cedar roof decking caps the roof and extends eaves out to give shading and definition to the shed roof. Metal siding is covering the stair saddlebag as well as the downstairs closet saddlebag. Exposed clerestory framing in the saddlebag provides for a top-lit stairwell to ascend to the upstairs master bedroom suite.

 

IMG_1449

Translucent PolyGal will enclose the areas of exposed framing to complete the stairwell clerestory.

 

 


 

 

 
 
 