casita framing is happening at a fast pace
Editorial Rating:
![]() ![]() ![]() ![]() ![]()
Average Rating:
![]() ![]() ![]() ![]() ![]() |
After a slow start to the foundation pour, framing has sprung up on the slab of the 850s.f. 2/2 guest house. By the end of the next week it should be all dried in and siding and roofing going on....
After a slow start to the foundation pour, framing has sprung up on the slab of the 850s.f. 2/2 guest house. By the end of the next week it should be all dried in and siding and roofing going on.
End of day one saw wall layout and framing and the floor trusses in place.
End of day 2 saw upper floor decking, wall layout and framing, stair construction, lower wall sheathing, and steel header fab and install at the upstairs roof deck.
By the afternoon of the third day of framing the roof trusses were up and blocked, and all of the interior walls were braced and blocked.
More pics next week...